COMMERCIAL

PROJECT EXAMPLE

Kingsford Smith Drive Upgrade

Project Size: $650M AUD

Location: Brisbane, Australia

Client: Blade Pile Group / LendLease

The Kingsford Smith Drive upgrade was a large update to the road network of Brisbane city. The upgrade involved widening the existing four lane road between Theodore Street at Eagle Farm, and Cooksley Street at Hamilton to accommodate 6 lanes. Pier and Pile Consulting Engineers client, Blade Pile Group was contracted to supply piles to support the above-water extension of the upgrade. 

PILE DETERMINATION

When working with the Blade Pile Group (BPG) on the KSD upgrade project, our design engineers worked alongside the BPG technical team to provide not only the foundation design, but also the installation solution.

The nature of the KSD upgrade mean the piling was to be completed off-shore, requiring particular machinery and an all new drive-tool unit to install the piles.

Through a comprehensive design and 3D modelling process, the team was able to create the ideal combination of pile and install unit. This initiative and ability to solve new problems lead to BPG being awarded the $2M piling contract.

DUAL BLADES

BPG’s screw piles utilise a twin-blade design instead of the more traditional helix design typically seen on screw piles. This design allows for a greater installation verticality and equivalent load capacity, while reducing the supplied cost of the pile. 

PIPE SPECIFICATION

The large, 219mm diameter tube of the pile was paramount to effectively sustain the torque forces applied during installation. The combination of the dual twin-blade design with the large, mitre cut tube section of the pile provided a perfect solution for this large-scale project. 

ksdpilerende-min

DESIGN EXECUTION

The final pile design proved to be a great solution for the KSD upgrade project. Over 1,600 piles were installed on large, barges with heavy duty machinery all along the main road and up the river. Contact our engineering team to learn how we can help with your commercial project today.

ksd1-min

Kingsford Smith Drive Upgrade Construction.

Kingsford Smith Drive Upgrade Construction.